Every case is real. Every number has a source.
Shanagan and Dalan are working open-pit operations in Mongolia. This page records the engineering we have done around them, and the standard a result must meet before it appears here.
Two named sites, from our own build record.
We built the terrain models the platform runs on from the mines' own survey exports. Every figure below is taken straight from that build record: survey geometry only, with no performance claims attached.

Shanagan
Open-pit coal mine, Mongolia
From the mine's own survey export we built the hillshaded elevation model that the platform's terrain and survey views run on for this site. The record below is that model's build geometry, exactly as computed.
- Site extent
- 4.05 x 2.41 km
- Survey points
- 594,026
- Grid resolution
- 1.75 m
- Elevation relief
- 100 m
- Coordinate system
- UTM 49N
- Survey date
- 2026-05-27

Dalan
Open-pit mine, Mongolia
Dalan is documented from its survey export and a satellite orthophoto. We rebuilt the site's surface model from those sources and recorded its geometry below, exactly as computed.
- Site extent
- 3.56 x 2.34 km
- Survey points
- 647,585
- Grid resolution
- 1.75 m
- Elevation relief
- 147 m
- Coordinate system
- UTM 49N
- Survey date
- 2026-07-27
How an engagement runs.
Discovery
One operational problem, stated plainly, with the people who own it in the room.
Assessment
Site conditions, data sources and existing systems, reviewed against that problem.
Pilot
A bounded deployment on the live operation. The measurement method is agreed before it starts.
Measurement
Results compared against the baseline recorded before the pilot began.
Decision
Stop, improve or expand. Only measured, customer-approved results are ever published.
Why this page shows geometry, not percentages.
A performance number appears here only when three things are true. None are yet, so none is shown.
Measured on site
The figure comes from the live operation, against a baseline recorded before work began.
Approved by the customer
The site owner has reviewed the measurement and agreed to publish it.
Published with its method
The number ships together with how it was measured, so it can be checked and questioned.
Bring the first problem.
One problem, one operating area, one measurable objective. We will scope the pilot and the measurement method with you.